"Our BIM digitisation system allows us to anticipate project problems, providing a high level of control in terms of quality, cost and time."
The BIM methodology marks a new era for professionals in the sector, managing projects with the aim of optimising work processes, creating a reliable database and obtaining a reduction in costs and deadlines.
We digitise our clients' projects with the following objectives in mind:
Anticipate the detection of lack of project information prior to the execution phase.
Improve the definition of the project and the coordination in detail of the different disciplines of the project (architecture, structure and installations).
Analyse in detail the important BIM5D measurements and optimise the cost of the project, reducing possible buffers, cost overruns and errors produced by traditional systems.
Control and improve the execution deadlines of the work through a 4D BIM planning system.
Reducing the variability and uncertainties of the project from the investor's point of view.
Having a technical team trusted by the property that looks after its interests.
Efficient control of the project, risk and investment.